Monday, August 31, 2009
Mateo: How to Draw Up a Project: Response
In terms of my own process, this is not an accurate map. My process flows between these stages and repeats stages many times over to revise and revisit formal ideas. It is a good linear guideline, but my process is iterative. A thesis should be the culmination of the design process, each part giving a firm foundation for the overall project.
Sunday, August 30, 2009
22@ Barcelona
The Poblenou district in Barcelona was redistricted on July 27th of 2000 to amend the Metropolitan Master Plan of 1976 and formally called the 22@ district. The Poblenou has been an industrial area for over 150 years comprising textile, foodstuff, chemical and metallurgical industry. The decline of these industries in the 1970s left the area abandoned. The redistricting of Poblenou changes the zoning from Industry to Commercial and Housing. Over 110 street blocks are affected by the new zoning and the Ajuntament de Barcelona has already poured 180 million Euros towards rebuilding infrastructure with the intent of attracting new technology businesses and a knowledge based economy.
http://www.22barcelona.com/index.php?lang=en